The City of Prescott and their contractor, Cactus Asphalt, are currently working on a pavement preservation project along selected roadways and alleyways throughout the Prescott area. The preservation process consists of removing existing roadways, rebuilding the subgrade with recycled roadway material, and installing new chip seal and PMM or asphalt. Additional work includes adjusting utilities to the finished road grade and restoring any disturbed traffic striping.

Once complete, these improvements will extend pavement life and improve the ride quality for Prescott motorists. The project is scheduled to be complete in fall 2020.

PAVEMENT PRESERVATION PREPARATION TO CONTINUE

Crews will continue performing potholing and survey operations, and lowering utilities in advance of pavement preservation across the work zones highlighted below.

Please be aware of the following impacts:

Monday, July 6 through Friday, July 10, 7 a.m. – 6 p.m.
Please be aware of street closures, lane restrictions, reduced speeds, rough road conditions, loud noise, and flagging operations throughout the work zones.